Click on image to view larger version.



Fig. 4. Core collection and lysimeter installation steps; (a) loading polyvinyl chloride (PVC) pipe into cutting bit; (b) hammering cutting bit into soil to collect core; (c) cutting off soil core; (d) leachate collection system (ceramic cylinder tension extractor); (e) placing the instrumented lysimeter below grade; (f) vacuum extractor leachate collection vessels.